CONTRACTOR AUTHORITY: GALLERY OF THE BRENNERO (BBT-SE)
CONTRACTING COMPANY:Brennero Tunnel Construction Scar.l.(Astaldi S.p.A. -
Ghella S.p.A. - Oberosler Cav. Pietro Srl - Cogeis S.p.A. - Pac S.p.A.)
WORKS: March 2017 - in progress. Construction of the Monaco-Verona Railway Axis -
Brenner Base Tunnel - B-130 "Mules Construction Lot 2 - 3", with a total extension of approximately 78 Km. Excavations
to be carried out with 3 Shielded TBMs, two with 10.60 m diameter and one with a 6.80 diameter.
AMOUNT: € 990 Million
ASSIGNMENT: Health, Safety and the Environment (HSE), Technical consultancy
on security management in the execution phase.